‹ TESTS
T-JUMP — Jump-link and inverter test
DIAGRAM
ATLAS
ANALYSIS
Setup
Operate the 300A bridge to self-jump; run the inverter off B3.
Pass criteria (written in advance)
Both function, B3 isolated afterwards
If it fails
Either fails — the reserve architecture needs review
OPEN OBSERVATION