Setup
After FET swap + full charge: run Starlink on B2, log the hours.
Pass criteria (written in advance)
Materially more than the historical ~4h (150Ah at 2-4A should run tens of hours)
If it fails
Still ~4h — the undercharge hypothesis was wrong; battery or converter investigation opens